Disconnection & Reconnection
19/08/2024
A recent disconnection and re-connection of a First Subsea SMC, demonstrates our connector durability
Installed for ~10 years, the mooring line required replacement, made possible by our dis-connectable connectors. Inspected, serviced and cleaned, the SMC looks like new ready for re-installation and operation
